The details illustrate the construction of a reinforced concrete ground-bearing foundation slab incorporating an extensive steel reinforcement arrangement.
The foundation is at the pre-concreting stage, with the reinforcement steel, perimeter shuttering, service penetrations and associated preparatory works substantially in place.
The foundation configuration corresponds with the proposed building footprint and accommodates variations in the external wall alignment or architectural layout.
The arrangement is for a reinforced concrete raft foundation. The precise structural classification are confirmed with reference to the engineering drawings, reinforcement schedules and foundation design calculations.